English Version  Chinese Version  Japanese Version 

G-store ( Petrol station )

System Information
System capacity: 9.52 kWp
Module: SWS a-Si (WD-A-CC-0875: 136pcs)
Location: Taiwan
Installation time: 2008/9/2
Accumulated power generation : 19063.02 kWh (2008/10/1 ~ 2011/02/28)
* system down for modification (2009/03/16 - 2009/04/01)
Average daily yield: 3.2 kWh/kWp/day (2009/04/01 ~ 2011/02/28)
Performance analysis G-store
1. The system was shutdown 2 weeks for modification in March/2009.
2. Simulation is based on the on site monitored meteorological data.
Comparison
(2009/07/01~ 2011/02/28)
Generated
watt-power (kWh)
Average daily yield
(kWh/kWp/day)
Yield difference
Simulation 16651.70 3.02 Ref.
Actual operation 17639.62 3.20 +5.9%

Technology

High frequency PECVD for silicon thin film deposition

LPCVD for in-house TCO deposition

Optimal mounting system for flat roofs, called Areo-10